Little Zak’s Academy, Bondi Junction

Little Zak’s Academy Bondi Junction has been in operation since early 2016. Since opening, they have been providing high-quality care programs for children by creating bonds with families and local communities.

This particular project was one of the most difficult access sites we ever laid our creative hands on.

Positioned on top of Bondi Junction bus terminal and train station every component of this place space design needed to be well thought out in regards to weight as the project is installed on 30mm compressed cement sheeting.

Material access was only from Newland St Bondi Junction and only available after 9 pm Wednesdays and Friday’s nights, lifting products into the site was with a 50-tonne crane so this in mind was a very difficult installation.

CRS specifically focuses on the most difficult projects above all else. What sets us apart is our ability to provide competent staff and a diverse range of methods to undertake the most difficult projects around.

Steep sites, deep excavations, tight access projects and sensitive sites are the types of jobs where we excel.

Playspace items included:

CRS Playspaces Inspired by Nature

Above Ground Trampoline

CRS Rope Play Challenges

Custom Boulder Wall